Material
Calculation
Sample Cost

 

 

 

Variations-
Metal
Transfer
Equipment
Power
Supply
Shielding
Gases
Wire
Electrodes
Safety
Welding
Techniques
Welding
Conditions
Economics
Weld
Defects
Mig Spot
Welding
Tables

 

4 The deposition efficiency is the percentage of wire that is actually deposited in the weld. For the mig process, this is approx. 95%. In the case of shielded metal arc, the deposition efficiency is approx. 65%, as much is wasted in the coating and stub loss. Figures 9-1 through 9-3 give the required pounds (Kg) of weld metal per foot (m) of weld using various joint designs. The formula for shielding gas costs is: Gas flow rate cubic feet per hr (1/hr) x gas cost per cubic feet (1) Arc travel speed in/min (cm/min)      x 60 min-/hr 12 in./ft. (100 cm/m) Adding the results of these 3 formulas will yield the welding cost per foot (meter) of completed weldment.